Hi gurus,
I have a project where we have 4 levels of wbs.
In level 4 we have post actual cost which we can see in CJI3, eg A-01-01-01.
when we run result analysis for the same WBS , i can see the value of RA in KKA2 for this same level 4 WBS.
However in t-code KKA2 , if i enter level 1 wbs i.e A, i can see only planned values , rest RA values are 0.
As per me RA value should be available at project level.
Please let me know where i am wrong and what would be the possible solution.
Regards
R SHARAM