CASE-I
In the Budget Analysis Screen (Screenshot 1), the assigned value after executing settlement should be 2,974,374 while when we open the BPGE table (Screenshot 2) the assigned value is doubled 5,948,748.
(Screenshot 1)
(Screenshot 2)
CASE-II
Whereas in another scenario, the assigned value and the BPGE table is showing SAME figures.
The Question is why the system is behaving in such a way making the assigned value double ?