Hi everyone,
We are in a SAP S4/HANA project, implementing the Project System module.
I regards to the revenue recognition, we are considering several methods (e.g. POC (Percentage of completion) and WIP (Work in process)).
We need help understanding if it is possible to have several revenue recognition methods for the same project?
It is also possible to post the result in two different ledger based on the different methods (e.g Ledger 1 - WIP; Ledger 2- POC)?
Thank you,