Dears,
My Case is as follows:
a material component is assigned to the activity in PS and the material takes 1 month for example to be delivered and it's entered in the lead time for the material in MM .
I need to know if it's possible for this lead time to appear in the project builder or if I can use material motoring dates in PS for this and how it can be set