How can I test the budget tolerance configuration that I have done for project? I have created budget profile and tolerance limit and assigned budget profile to the project. I have created budget for L1 WBS (CJ30), Released the budget (CJ32). The Availability control is active (CJBV).
When time is entered for project WBS, the tolerance limit needs to be check before time is approved. Can someone help me with this?
Thanks