Hi,
We need to develop PM-PS integration. Pm order will be schedulled through network.
There are two functions we can demonstrate in SAP PS;
1. Demonstrating Basic scheduling ( Maintenance)
a. Data is given as below
2. Integration with SAP PM
a. Demonstrate how maintenance orders can be linked to Sa network /WBS
i. Scheduling
ii. Financial functions like
1. Planned costs
2. Actual costs
a. Services
b. Material
c. Manpower
d. ..
Will anybody give me idea how to proceed and what will be the configuration.
Regards,
SR