Aggregated Planned POC and BCWS
Dear PS Gurus, The question is regarding the relation of Aggregated Planned POC, Planned Cost with BCWS. WBSPOC WtAggregated POCNon Aggregated POCPlanned CostBCWSExpected Results of...
View ArticleManually Changing Planning Method In Planning Board
Hi Experts, I have set a particular project profile planning method to open planning for both both basic and forecast. In addition, I have set scheduling scenario to free scheduling. Per other threads...
View ArticleAutomatic Release of Network Header when Activities are released
Hello SAP experts! We have an issue where the automatic release of the Network Header once all Activities below it are released is also causing new additional Activities to be automatically released....
View ArticleRemaining Plan Order value at Individual Order level in SAP Report
hi All, I was checking 'Remaining Plan Order value' in few Std. reports (S_alr_87013558; 12KST1C etc.) & see that the 'RemOrdPla' is displayed ONLY at WBSE Level. I've checked Table: RPSCO, but it...
View ArticleE- Reservation XXXXX is already being processed by UserABC
Hi Experts, When saving a project B I get this message " Reservation XXXXX is already being processed by user" , However such reservation # does not even exist in the system. I check in ME24 and table...
View ArticleCN41N showing Planned Cost for deleted Production Order
Hello Everyone, In CN41N the Project cost plan is including planned cost of deleted production orders. Planned Cost for deleted Production Orders is not showing individually but rolled up to top WBS...
View ArticleProject Type Invalid
I configured a new project type. I then created a new WBS and selected the new project type. Upon saving I get an error stating" The WBS Project Type selected is not valid for this WBS Element Mask."...
View ArticlePlanning/Actuals and EVM
Hi Experts, I have read and tested and have not found a way to plan on a higher level planning element and post on a lower level account assignment element and have EVM calculate (BCWS and BWCP). I...
View ArticleWBS with Budget in Interface
Hi, We have a 3rd party tool for time management and the interface sends only the valid WBS element to the 3rd party tool for entering time.The WBS with status DLFL, CLSD, TECO & ISBD is not sent...
View ArticleLocking of Material Component when PR has been approved
Hello SAP Experts! I need help in locking the Material Component under a Network Activity once the PR that was created upon release of the Activity. Right now, users can still modify the date and...
View ArticleSAP PS Plant Stock Vs Project Stock
Hi All,I have never worked on Project Stock(Valuated & Non-Valuated).I was wondering on what basis business decides to go for Project Stock. Moreover, SAP recommends to use Valuated Project Stock...
View Articlecopy projects/wbs elements from Production to lower lifecycles
Hi All , Please let me know if there is a way to copy projects/wbs elements from Production to lower lifecycles. It could be any method - BDC/LSMW/custom program/IDocs . .just give me a method..
View ArticleError During Network deletion in CJ20N
Hello Gurus, issue is --User tried to delete a particular network in project ..during deletion he tried to copy the activity ..runtime. error occurrednow when i try to delete that particular network...
View ArticleNeed to disable button in CJ20N
SAP GURUs, I have a requirement to diabale DELETION FLAG-SET button in CJ20N tcode. Pl find below screen for the same. Request you to pl suggest me, how to achieve this. thank you in advance. BR,Shabaree
View ArticleChange display setting for WBS in CJ3* and CJ4* T-Code series
Dear Experts, Please adivise me how can I make default WBS Display options setting to using description only in CJ30 Series and CJ40 transaction. So every time when user open any project they don't...
View ArticleRemaining Plan Order value at Individual Order level in SAP Report
hi All, I was checking 'Remaining Plan Order value' in few Std. reports (S_alr_87013558; 12KST1C etc.) & see that the 'RemOrdPla' is displayed ONLY at WBSE Level. I've checked Table: RPSCO, but it...
View ArticleE- Reservation XXXXX is already being processed by UserABC
Hi Experts, When saving a project B I get this message " Reservation XXXXX is already being processed by user" , However such reservation # does not even exist in the system. I check in ME24 and table...
View ArticleSchedulling PM order through project system
Hi, We need to develop PM-PS integration. Pm order will be schedulled through network. There are two functions we can demonstrate in SAP PS;1. Demonstrating Basic scheduling ( Maintenance)a....
View ArticleIncoming order Value type 19 KOr1
Hello All, After planning for WBS, when i run CJA2,it automatically shows overhead values and after saving,these are shown in RPSCO and COSB tables with Value type 19 and Business transaction KOR1. I...
View ArticleResult Analysis POC method problem
Hi All, We have a type of POC project where we need to carry out Result Analysis. We are going to have Cost Based result Analysis method. The design of WBS structure is as follows as of now: Level 1...
View Article