Error when PS settlement CJ88 to G/L (urgent)
Hi All, I have maintain and configure settlement rule for PS. Under project Settlement rule I have enter G/L 122100 (balance sheet) Ful C11 for activity 002 and 003. During settlement time CJ88, the...
View ArticleNot Able to assign Material Component to WBS as well as Network.
Hi Guys I am not able to assign material component to wbs and to network .Material Component option is not active for wbs/netwrok. However , I am able to assign the same for Activity. Tell me guys ,...
View ArticleHow to do WIP from PS module?
Following is requirement from client. Client has not implemented PP module. They have PS, FICO, MM, SD.1. Client is Manufacturing Moulds for Third Party. 2. Direct Material, Labor &...
View ArticleService PR creation Auto with Q & D Assign from PROJ
Hi Experts, Can we set system to create service PR automatically create once we save project structure, I am using Service master and while saving i am getting requisition number but with N & D...
View ArticleChanges to Availability control-CJBN impacts on existing Budgets
I have made some changes to availabilitty control tolerance limits. The recommendation is to run :1.CJBW - Deactivate avac2. CJEN - Reconstruct PS info database ( Does this impact all the projects...
View ArticleSAP Dump during starting CJ20N
hi all When i try to open the transaction CJ20N the SAP system will dump.The dump is an CONNE_IMPORT_WRONG_COMP_LENG, CX_SY_IMPORT_MISMATCH_ERROR exception. I receive the message " Error when...
View ArticleEasy Cost Planning
Hi Folks, I have one doubt when I was doing easy cost planning in Internal process, 1. I have selected Catagories E and Sources is :- 1000 and Plant is 1000 2. Given Quantity 10, and press enter then...
View ArticleMultiple RA version for Controlling area
Hi Experts, We have a situation where there is a new RA Treatment needed for a Company code. New project profile and RA Keys are configured for these projects but using the same company code.I don't...
View ArticleCalculation of RA Key - Revenue Based with Profit Realization
Hi All, There is a new RA Key which has been configured based on 'Revenue-Based Method - With Profit Realization'. Attached screenshot for the settings: Please advise: 1. What will be calculation...
View ArticleIssue with Commitment posting to WBS while Creating Material PR/PO
Hello, We are facing issue, Commitment is not posting to WBS while creating PR/PO from PS and MM both module. But if we create Service PR/PO all postings of Commitment done as per standards. I have...
View ArticleHow to get Customer for all the WBS Element postings
Hi All, I am tryng to Customer associated with any WBS posting in PS. The effort I have done for this is as below; 1. Took OBJNR from PRPS for the required WBS Elements from CJI3 output.2. Passed OBJNR...
View ArticleBAPI_COSTACTPLN_POSTPRIMCOST_Number Range for Act RKP5 Error
Hi Experts, We are trying to create a program to update CJR2 with revenue plan for a WBS and cost element for specific periods. (don't what to use excel integration standard solution)So we are using...
View ArticleDifferent currency in cost planning
Hi All, In same project structure we are using different currency for each wbs (for Ex under project we had created 4 level of WBS ) my question is can we able to plan cost with their updated in WBS...
View ArticleInterest is not calculating correctly in Project System
Hello Gurus, We have implemented functionality to capitalized interest on Asset through Project system. We are calculating interest as per line item basis. System is not calculating interest correctly...
View ArticleProject Scheduling issue in the project planning board
Dear PS experts, I have an issue while making project scheduling i have a project as below: WBS 1 ---------------Act 1 ------- ACT 2--------...
View ArticleCan we use a variant configured group BOM with SAP PS (configurable network -...
The scenario is that the organization wants to implement assembly processing with networks for their MTO variant configured scenario. The super BOM is maintained as a group BOM i.e. without any...
View ArticleMilestone Actual Dates
Dear Experts, Please note that actual dates are not copied automatically to milestone even though I maintained the confirmation parameters. Any idea what could be the reason? ThanksAbdul
View ArticleGenerate PR from stock item in network activity - PS
Dear Experts, I have two points in PS:I want to generate PR from stock material on PS activity.I want only PR but system will generate reservation as well when assigning stock item. I have configured...
View ArticleR&D Project
Hi experts, Please guide me how to create R&D project and its execution in short. Thanks
View ArticleSKF Tab Not Coming at Activity Level
Hi Everyone, Please suggest on below two issues on the earliest. 1. My client requires Progress analysis at Activity level, but SKF tab not coming at activity level, I found SAP note 1733126, 19015666,...
View Article