Changing appropriation request costing structure

Hi, I have created appropriation request (AR) and assigned budget in one category, AR is approved now I want to change the costing structure and would like to assign budget to new category.How can I...

View Article


Difference Between External And Internal Activity

Hi, Can anyone plz tell me why we use external activity if can attache material component/BOM to both internal and external activities. For internal activity it is understandable that we use it for...

View Article


Make Material Field of CJ20N Mandatory

Hi all, How exactly can one make the material field within the material component of CJ20N mandatory? I'm looking for some form of configuration/how-to-steps on how this field can be made a...

View Article

PS/SD Revenue planning

Hi gurus, My client has one line item in contract(SD) with complete scope of work and we are planning to use milestone billing.eg 10% after signing of contract     20% after approval of design     65%...

View Article

Inventory cost not updated in PS reports

Dear Experts, Need your inputs. We uploaded inventory to WBS's, After upload we found there was slight change in inventory cost / Quantity in CJI3 from tables or stock report (MBBS). Unfortunately, It...

View Article


IM PS overall budget release to annual budget release activation process

DEARS, Our client is using IM PS module with overall release budget availability check for the last ten years. In short, create IM program investment program in 2007 till 2016 i.e. INT/2007 till...

View Article

Project Planning Board Issue

Dears, Can some one help me if he faced this problem before the project planning board table area is appearing with no text as per the below screen shot  can any one help me Best Regard  Allaa Waked

View Article

Workflow on Network Activity

Hi, In our client process when never user confirms the particular network Activity in CJ20N /CN25  mail needs to trigger  automatically to user who conform's that activity. please help me to make to...

View Article


Error during Setting deletion Flag "Sales doc. item (Doc# & Item#) && not...

Dear Guru's, I am getting error message "Sales doc. item & & not delivered or invoiced completely" while setting the Deletion Flag at Project Def/WBS level. However when i checked the SO's, all...

View Article


Overheads consuming/assigning budget at time of release.

Sir,In my case1)Overheads are planned through costing sheet (10%).2)When WBS/network activities are released,the associated overheads with each activity also start consuming budget.3)Suppose material...

View Article

Image may be NSFW.
Clik here to view.

Capacity Levelling at activity level

Hi All, I want to check capacity of my internal activity for which I have assigned workcentre on that activity.Formula which I'm using capacity is 'SAP008' After assign hours to activity, when I run...

View Article

System not checking Budget during Condition change in PO

Dear Friends, whenever we change in conditions of the PO, system is not checking budget for the same. I do have Account Assignment WBS provided in PO. with AVAC activated on same.take an example WBS...

View Article

DP91/RRB- Reg. Controlling Area currency in EK01 CnTy

Hi, We have multiple currencies in which we operate. USD is the controlling area currency. The WBS in this case is in GBP and sales order is also GBP We have configured RRB for billing actual cost...

View Article


Image may be NSFW.
Clik here to view.

Planning board at project level

Hi All, I was trying to view project planning board from 'CJ20N' by selecting project but when I select project, no button is shown for planning board.That button is shown at WBS level so when I select...

View Article

Budget Exceeded Error with Mail - Change in Mail message

Dear All, I have one query and i need expert suggestions on how to proceed further, I have an requirement where i need to change the Standard mail message for budget exceeded error when i have selected...

View Article


User status profile-status number discrepancy in TJ30 table

Hi All, There is an inconsistency in TJ30 table for a user status profile(Zxxxxxxx). The user status no. in TJ30 table for a status suppose EH(Erection held) is E000X but for the same status EH the...

View Article

Data Migration for Project Definition in S/4 HANA

Hi, Can somebody advise me if they have used a BODS tool to upload Project Definition from excel files. If I have defaulted all my controlling profiles, Budget profile, Plan profile, settlement profile...

View Article


All networks shows up in Network graphics

https://scn.sap.com/thread/3824085 Hi ,I saw this issue resolved in above thread. This is related to multiple networks showing on the network graphics even though we select just one network in the...

View Article

Overheads in PS

Hi AllI am having some difficulties on finding the overhead values and information. Simlpy, our company is calculating overheads on Budgets, ECPs, Plan Costs, and Actuals. We would like to build a...

View Article

CJR2- Excel Upload, getting errors-The initial value is not valid for...

Hi, I have done the configuration for excel upload in CJR2. Created a layout as below Lead Column WBS (char value & Name)Lead Column Cost Element (char value & Name)Lead Column Year (Char...

View Article