Changing appropriation request costing structure
Hi, I have created appropriation request (AR) and assigned budget in one category, AR is approved now I want to change the costing structure and would like to assign budget to new category.How can I...
View ArticleDifference Between External And Internal Activity
Hi, Can anyone plz tell me why we use external activity if can attache material component/BOM to both internal and external activities. For internal activity it is understandable that we use it for...
View ArticleMake Material Field of CJ20N Mandatory
Hi all, How exactly can one make the material field within the material component of CJ20N mandatory? I'm looking for some form of configuration/how-to-steps on how this field can be made a...
View ArticlePS/SD Revenue planning
Hi gurus, My client has one line item in contract(SD) with complete scope of work and we are planning to use milestone billing.eg 10% after signing of contract 20% after approval of design 65%...
View ArticleInventory cost not updated in PS reports
Dear Experts, Need your inputs. We uploaded inventory to WBS's, After upload we found there was slight change in inventory cost / Quantity in CJI3 from tables or stock report (MBBS). Unfortunately, It...
View ArticleIM PS overall budget release to annual budget release activation process
DEARS, Our client is using IM PS module with overall release budget availability check for the last ten years. In short, create IM program investment program in 2007 till 2016 i.e. INT/2007 till...
View ArticleProject Planning Board Issue
Dears, Can some one help me if he faced this problem before the project planning board table area is appearing with no text as per the below screen shot can any one help me Best Regard Allaa Waked
View ArticleWorkflow on Network Activity
Hi, In our client process when never user confirms the particular network Activity in CJ20N /CN25 mail needs to trigger automatically to user who conform's that activity. please help me to make to...
View ArticleError during Setting deletion Flag "Sales doc. item (Doc# & Item#) && not...
Dear Guru's, I am getting error message "Sales doc. item & & not delivered or invoiced completely" while setting the Deletion Flag at Project Def/WBS level. However when i checked the SO's, all...
View ArticleOverheads consuming/assigning budget at time of release.
Sir,In my case1)Overheads are planned through costing sheet (10%).2)When WBS/network activities are released,the associated overheads with each activity also start consuming budget.3)Suppose material...
View ArticleCapacity Levelling at activity level
Hi All, I want to check capacity of my internal activity for which I have assigned workcentre on that activity.Formula which I'm using capacity is 'SAP008' After assign hours to activity, when I run...
View ArticleSystem not checking Budget during Condition change in PO
Dear Friends, whenever we change in conditions of the PO, system is not checking budget for the same. I do have Account Assignment WBS provided in PO. with AVAC activated on same.take an example WBS...
View ArticleDP91/RRB- Reg. Controlling Area currency in EK01 CnTy
Hi, We have multiple currencies in which we operate. USD is the controlling area currency. The WBS in this case is in GBP and sales order is also GBP We have configured RRB for billing actual cost...
View ArticlePlanning board at project level
Hi All, I was trying to view project planning board from 'CJ20N' by selecting project but when I select project, no button is shown for planning board.That button is shown at WBS level so when I select...
View ArticleBudget Exceeded Error with Mail - Change in Mail message
Dear All, I have one query and i need expert suggestions on how to proceed further, I have an requirement where i need to change the Standard mail message for budget exceeded error when i have selected...
View ArticleUser status profile-status number discrepancy in TJ30 table
Hi All, There is an inconsistency in TJ30 table for a user status profile(Zxxxxxxx). The user status no. in TJ30 table for a status suppose EH(Erection held) is E000X but for the same status EH the...
View ArticleData Migration for Project Definition in S/4 HANA
Hi, Can somebody advise me if they have used a BODS tool to upload Project Definition from excel files. If I have defaulted all my controlling profiles, Budget profile, Plan profile, settlement profile...
View ArticleAll networks shows up in Network graphics
https://scn.sap.com/thread/3824085 Hi ,I saw this issue resolved in above thread. This is related to multiple networks showing on the network graphics even though we select just one network in the...
View ArticleOverheads in PS
Hi AllI am having some difficulties on finding the overhead values and information. Simlpy, our company is calculating overheads on Budgets, ECPs, Plan Costs, and Actuals. We would like to build a...
View ArticleCJR2- Excel Upload, getting errors-The initial value is not valid for...
Hi, I have done the configuration for excel upload in CJR2. Created a layout as below Lead Column WBS (char value & Name)Lead Column Cost Element (char value & Name)Lead Column Year (Char...
View Article