Hi Guys,
I am trying to create Claim and the currency is getting adopted from Company code for Project. Can we control the currency while creating claim.
Hi Guys,
I am trying to create Claim and the currency is getting adopted from Company code for Project. Can we control the currency while creating claim.
Hello Experts,
Before Go-Live, we are going to create/upload templates for running project .
Kindly suggest as to how we upload the costs on these existing projects for reporting purpose exclusively, and forthcoming costs will be booked in regular way.
Kindly suggest .
Best Regards.
Dear experts,
I am dealing with the dates planning on network activities and I face a problem when the planned sequence of activities is not maintained in the actual confirmations, please let me explain it with an example:
The planned sequence is:
Act.1 --> Act. 2 --> Act. 3 (the relationships are Start-Finish)
The actual confirmations set that the Act.3 was started before Act.1 and Act.2 were finished, against planned sequence.
Therefore, we have an “out-of-sequence” scenario.
I would like to keep the confirmed part of the activity 3 duration in the actual dates and the remaining part of the duration in accordance with the precedence of Act.2; this is some kind of “split” of the activity duration (this is possible in other planning software products).
The SAP PS scheduling options allows to not taking into account de actual dates, but I could find no options to configure what I need (the “splitage” of the duration).
Could you give some advise if there is a way to configure SAP PS scheduling to manage the out-of-sequence scenario “splitting” the activities duration?
Thank you very much in advance.
Al. Arias
Dears,
My Case is as follows:
a material component is assigned to the activity in PS and the material takes 1 month for example to be delivered and it's entered in the lead time for the material in MM .
I need to know if it's possible for this lead time to appear in the project builder or if I can use material motoring dates in PS for this and how it can be set
Hi All,
I was trying to maintain statistical key figure but when I'm trying to maintain it, I got below error:
Message No. 7A066
I have also maintain Create Statistical Key Figures from KK01 T-code but still not able to maintain in customization. So kindly tell me which configuration step I'm missing.
Urgent response will be very helpful.
Regards,
Faizan
HI,
sorry if it is a stupid question.
My users are looking to disable Error Message Error Message BQ020 - Negative budget
As sometimes with some currencies conversion they have some iimaterial negative balances and don't want to bother
Please could you tell what exactly the negative consequence will be if we eliminate that Error message somehow.
Thank you very much in advance,
Daria
Hi Experts,
The help documentation for RA Method 15 (revenue from RRB) says that it cannot calculate reserves.
Can anyone please explain this in details?
Does it mean that in a scenario where there are no actual cost/hrs to be invoiced, but if during RRB if we enter some advance amount when creating billing request, how will the RA in that scenario work? Will there be a deferred revenue posted in BS?
Thanks,
Krishna
Hi Experts,
In current setup, Campaigns are replicated from CRM to PS and created as WBS elements. The Campaign plan dates are replicated and stored in basic dates in WBS element. There is Campaign Run (Start/End) date too, which are required to be replicated. Since this is not there in standard dates for PS, I would like to know if its possible to add another date type at WBS level? How?
Additionally, could you tell me which BADI to use for mapping this CRM field to one on WBS?
Regards,
SAP Gurus,
How can I test the budget tolerance configuration that I have done for project? I have created budget profile and tolerance limit and assigned budget profile to the project. I have created budget for L1 WBS (CJ30), Released the budget (CJ32). The Availability control is active (CJBV).
When time is entered for project WBS, the tolerance limit needs to be check before time is approved. Can someone help me with this?
Thanks
Shirley
Hello Experts,
I am using "BAPI_NETWORK_COMP_ADD" to create a new Material Component under a network activity. The BAPI has Network as importing parameter and importing table is BAPI_NETWORK_COMP_ADD.
In this table we have to pass activity number, item category, procurement type, material etc....
I am unable to determine the procurement type for a material which could be passed to this table's field TYPE_OF_PUR_RESV. However, if I am not passing procurement type, the BAPI always creates "Reservation for network" which can be seen in CJ20N. But when you create the same material under any activity using transaction CJ20N it takes the appropriate procurement type..
As per my requirement, could you please help me how could I get the exact procurement type which can be passed to the parameter(TYPE_OF_PUR_RESV), which may result to the correct procurement type.
Any help would be appreciated and awarded.
Best Regards,
Chhotan.
Hello Team,
Need help in below two issue
1. WBS have three activities. I had plan three activity and in cj30 updated budget of Rs. 1000 to WBS. Below is plan cost details details
WBS - Rs. 1000
Activity one - 10 Hrs - Rs. 500
Activity two - 5 Hrs - Rs. 400
Activity three - 2 Hrs - Rs. 100
i had release project and confirming activity one for 14 hrs but system give budget exceed error. Budget is available at WBS level .
I want system should check WBS budget what need to do.....
2. When i confirm activity one for 14 hrs message come budget exceed and actual cost calculation error but system confirm hours without updating actual cost. I want to cancel confirmation also if actual cost not updated. I had try to active cancel confirmation in OPST but it not work
Hi all, just a short qustion
its posible to change the WBS Elemenet keys with CNMASS? unfortunately i cant finde the Field "WBS Element key" there (in CNMASS)
Thanks a lot
Kr
oal
Hi Experts
need your help in :
S_ALR_87013572 shows no data against Cost element (RA key) 9* series ( cost element category 31), while S_ALR_87013568 shows that there are RA postings ( in Controlling Currency only).
what could be the reason.
in our config OKG9, generate line items is unchecked, is that the reason and
what is the performance hit we would take if we turned Generate Transactions on?
Thanks
Kartik
Hi PS expert,
One of my client would like to settle finally WBS element to Internal Order.
The particularity is that WIP is calculated on WBS element.
- When WBS is RELEASED
- When WBS is TECO,
One thing: WBS is defined as account assignment and billing element.
Any ideas?
Thanks!
Hi All,
I am working with progress analysis and getting the values POC (plan, actual), but not getting BCWS / BCWP values. I'm using measuring method for multiple activities which are TIME PROPORTIONAL, COST PROPORTIONAL, DEGREE OF COMPLETION and ACTUAL PLAN. I had already maintained the required Customizing for this and we have costs planned and posted at activity level.
Next, the Customization I maintained is :
1. Created Progress Version 100 with exclusive use 'Progress
Analysis'. I have selected Plan & Actual check boxes.
2. Settings for Progress Version-
a) Plan version - '0'
b) EV basis - Cost plan (active project, total values)
c) POC weighting - Weight (active project )
d) Planning type - Basic dates
e) Early / Late - Earliest possible
f) Both reference boxes selected
3. SKFs- I created three SKFs & assigned to Val. Categories.
4. Haven't maintained the default measurement method but maintained in CJ20N against Activities with Time proportional method.
5. Created progress cost element, maintained default, created Cost element group and assigned to value category.
6. In this cost element group, I have not assigned any other cost elements
Before running CNE5, I have also run CNE1 but still not able to obtain BCWS / BCWP values. Can someone help me in getting the BCWS / BCWP?
Regards,
Faizan
Good Morning,
I'm trying to use the standart PROJIF_CN_PROJECT_OBJECTS function belonging to the group of PROJIF functions, and the associated program SAPLPROJIF, and something happens to me the following: When using the function with a project system status other than technical end (<> CTEC ) returns data correctly, specifically the ACT01 table filled with all the operations associated graphs, but if the project is CTEC does not.
SAP ABAP Program SAPLPROJIF - SAP Datasheet - The Best Run SAP Run SAPDatasheet
This is correct? There is a function that allows me to get the ACT01 regardless of the status of the project?
I appreciate any help.
Best regards
Dear,
what is the reasonof aPRsourcecommitmentdisappearwhen placedas a referenceinan OPand thisis memorizedin the reportS_ALR_87013558andremainscommitted toPRinCJI5transaction?
Urgentneedof afeedbackabouttopass onto mycustomer.
I am looking forward andthank you in advance.
Best regards
Vitti
Consultant IM PS
Hi All,
I have assigned measuring method for on WBS element or activity for which I want to see progress in CNE5 report.Before executing CNE5, I executed CNE1 after that CNE5. I have done all configuration related to Project Analysis and Statistical Key Figure but still zero value is showing me in report. Below is my question for project progress report:
Below is the standard measuring method.
Waiting for prompt reply.
Regard,
Faizan
Hi Experts,
Need a clarification on how SAP PS is related to COGS and COGM.
Client is a manufacturer of specialized product and works in MTO scenario. Client has Milestone payment with customer, hence we opted for Order Related Billing.What will be the impact of Order related Billing with COGS.
when we are doing project delivery in CNS0 and picking/packing through VL01N, I can understand that through 601 movement type COGS is hit.
We assign Billing Element Components(FERT) in our activity. During MRP run thru MD51, plan order is generated, then PP converts Plan Order to Prd Order with account assigned to WBS. then order is settled to WBS. so all actual and variance gets settled to WBS. Can you please explain the relation with COGM in this business case.
Regards,
AM
Hi Friends,
I am facing problem for connecting MS-Project professional 2012 with SAP PS. as OpenPS is not supporting MS-Project professional 2012.
Is there any other way to connect SAP PS and MS-Project professional 2012. Kindly help me with the process.
Note: There is no Project Server Installed. but if it is possible with project server kindly provide me those details too.
Thanks & Regards
Omkar Deshpande